Is your solar KPLC-approved?
Solar power sent to the grid without approval can now be charged. SunLink makes your system compliant, from the first site visit to KPLC sign-off, so your exports earn credit on your bill.
What changed
Net metering is now the law
Under the Energy (Net-Metering) Regulations, 2024 (Legal Notice 104, gazetted 26 July 2024), any home or business whose solar can feed power into the Kenya Power grid needs an approved net-metering agreement and a bi-directional meter.
Exporting without approval is treated as unauthorised injection and can be charged at the applicable base tariff, or lead to disconnection.
Systems over 10 kW need an engineer's feasibility study. Agreements run for five years and are renewable; unused credits lapse at the end of KPLC's financial year. Summary for guidance only, based on the 2024 Regulations and EPRA/KPLC communications as of September 2026. We confirm the exact requirements for your site at assessment.
How net metering works
Your solar, working with the grid
Use solar first
Your home or business runs on its own solar power during the day.
Export the surplus
Extra energy flows to the Kenya Power grid and is recorded by a bi-directional meter.
Offset your bill
Exported units earn credit against the power you import at night or on cloudy days.
From first call to first credit
Seven steps. We handle all of them.
Your panels, batteries and inverter usually stay in place. We add the metering and controls around them, and keep your system on zero-export until KPLC approves, so nothing reaches the grid unauthorised.
Book your assessment
Share your KPLC account number and a photo of your inverter.
Within 48 hoursSite assessment
An engineer checks panels, inverter, board, earthing and system size.
One visit, 2–4 hrsQuote & plan
A fixed, site-specific quote. Nothing starts until you approve.
2–3 working daysInstall & comply
MGM smart meter, CTs, isolation switch and protection fitted.
1 day · 2–3 commercialTest & commission
Anti-islanding, readings and protection tested. Handover pack.
Same dayKPLC application
We submit your application and attend the KPLC inspection with you.
Typically 2–4 weeksApproval & go-live
KPLC fits its revenue meter; we switch export on and credits begin.
Set by KPLC
Service options
Pick the level of support you need
Compliance Check
- Site inspection and audit
- EPRA / Kenya Power application filing
- Clear report on what is needed
Full Turnkey
- Everything in Compliance Check
- Bi-directional meter supplied and fitted
- Licensed installation, testing and sign-off
- KPLC paperwork and inspection handled
New Install + Net Metering
- Solar system supplied and installed
- Full turnkey net-metering package
- Connected legally from day one
Optional add-on: a monthly monitoring subscription to track generation, export and savings.
Built for
Homes, businesses, contractors and estates

Homes
Single-phase homes up to 4 kW and three-phase villas up to 10 kW, often with batteries.

Businesses & institutions
Shops, clinics, schools, offices and factories, with installs scheduled around your operations.
Solar contractors
Trade pricing on MGM meters, bulk orders, and our installation and testing crews for your projects.

Developers & estates
Estate-wide assessments, handover-ready new builds, and prepaid STS sub-metering for every tenant.
The equipment
MGM smart meters
Bi-directional meters that record every kWh you import and export, enable export limiting and give accurate solar monitoring.
| Your site | Recommended meter |
|---|---|
| Single-phase home or shop, solar up to 4 kW | MGM Single Phase Smart MeterDDSU666 · direct 80 A · RS485 Modbus |
| Three-phase home, office, school or shop | MGM Three Phase Smart MeterDTSU666 · full import/export data |
| Commercial board, loads above 80 A per phase | MGM Panel Meter + CTsPD666 · Class 0.5S |
| Landlord, estate or group billing units | Prepaid STS Meter + Interface UnitDDSY666 + CHU630 · 20-digit token top-up |
We confirm your inverter's compatibility at the site assessment. KPLC's own revenue meter is fitted separately by KPLC after approval.
Quality & safety
Installed by licensed professionals, documented fully
EPRA-licensed team
Solar PV technicians (T1–T3) and electrical contractors, matched to your system size.
Verified credentials
Every licence can be checked on EPRA's online portal.
Our own crews
We contract our electricians directly, with no anonymous referrals.
- Import and export readings verified against a live load
- Anti-islanding: inverter disconnects within 2 s of grid loss
- Export limit holds at zero until KPLC approval
- Voltage and frequency trip settings checked
- Isolation switch operation and labelling
- Earthing and insulation resistance checks
You receive a test and commissioning report, as-installed photos and single-line diagram, your KPLC application pack, and a user walkthrough. Homes: one day, with solar off for about 2–4 hours.
Pricing
Every site is different, so is every quote
We don't publish a one-size-fits-all price. After assessing your solar setup, you receive a clear, itemised, fixed quote with no hidden extras. Contractors can request our trade price list.
- Book a site assessment
- We analyse your system and connection
- Receive your itemised quote
What shapes your quote
- Single- or three-phase supply
- Size and condition of the solar system
- Meter model required
- Cable runs and site access
- Existing approvals and paperwork
Book your site assessment
Get your solar connected, compliant and credited
Tell us about your property and solar setup. We'll get back to you within 48 hours with a visit date.
Helpful to have ready
- KPLC account or meter number
- A recent electricity bill
- Inverter make, model and kW rating
- Photos of your inverter and main board
- Company name and KRA PIN (businesses)
Thank you — request received
Questions
Net metering, answered
Will my existing panels and batteries still work?
Yes. In most cases your panels, batteries and inverter stay in place. We add the metering, isolation switch and protection around them and update the inverter settings to KPLC limits.
Will I be without power on installation day?
Only your solar is isolated, for about 2–4 hours at a home. We keep grid power on wherever possible. Commercial sites take 2–3 days, scheduled around your operations, including evenings and weekends.
Does KPLC pay me for the power I export?
No cash is paid. Once approved, each kWh you export earns a bill credit worth 50% of the kWh exported, offsetting the power you import. Unused credits lapse at the end of KPLC's financial year.
What happens before KPLC approves my system?
We set your inverter to zero-export, so nothing reaches the grid without approval and you face no charges for unauthorised injection.
How long does it take?
About 1–2 weeks from booking to a tested, compliant system. The whole journey to your first net-metered bill is typically 10–16 weeks, depending on KPLC's approval and meter installation, and can be longer outside major towns.
Where do you work?
We are based on Riverside Drive, Nairobi, and serve customers across Kenya, including Nairobi, Mombasa, Kisumu, Eldoret and Nyeri.
Get your solar connected, compliant and credited
One partner from first inspection to final KPLC sign-off.